Sony Center Conversion

Sections of the Sony Center in Berlin’s Potsdamer Platz are being adapted to cater to changing customer requirements.

Within the framework of the structural engineering LP1 – LP5, all structural measures to modify the shell structure were implemented in this context.

Reconstruction Measures due to Changed Utilisation Requirements

Two larger interventions are set to repurpose the site’s existing IMAX theatre: The aboveground IMAX auditorium will be converted into a food court with offices spaces above, and the auditoria beneath the courtyard will be turned into a gym. Smaller alterations will also be made to various individual rental units

Werner Sobek already engineered large parts of the original Sony Center back in the 1990s. We now provide structural engineering services as well as facade engineering for the refurbishment.

Architecture
Jahn, Chicago/USA
Aukett+Heese, Berlin/Germany
Kinzo, Berlin/Germany

Planning time
2020 − 2022

Construction time
2021 − 2025

Services by Werner Sobek

  • Structural engineering (WP 1 – WP 5)
  • Facade engineering

Client
Oxford Properties Management GmbH, Berlin/Germany