Riederwald Pedestrian and Cycle Bridge
With a span of 61.60 m, the integral structure spans the A66 motorway in one go. The foot and cycle path bridge elegantly connects the Frankfurt districts of Seckbach and Bergen-Enkheim with the Fechenheimer Wald recreation area.
Integral Structure Connects City and Recreation Area
Reinforced concrete cantilevers extend the two abutments, which are founded on drilled piles, towards the carriageways. The central steel cross-section of the structure consists of two lateral hollow sections. Between them is the orthotropic carriageway slab, which is flexurally rigidly connected to the cantilevers.

Architecture
Werner Sobek, Stuttgart/Germany
Planning time
2020 – 2021
Construction time
ca. 2028
Services by Werner Sobek
- Object planning, structural engineering (WP 2 –3 acc. to HOAI)
- Structural engineering (WP 2 –3 acc. to HOAI)
- BIM specialist planning
(Demand Planning; Visualisation; Coordination of Disciplines; Design Reviews and QA/QC; Analysis, simulation and verification; Derivation of drawings and documents; Quantity take off and cost analysis/estimation)
Bridge area
308 m²
Client
Die Autobahn GmbH des Bundes, Gelnhausen/Germany
Photography
Werner Sobek, Stuttgart/Germany