Riederwald Pedestrian and Cycle Bridge
With a span of 53 m, the integral structure spans the A66 motorway in one go. The foot and cycle path bridge elegantly connects the Frankfurt districts of Seckbach and Bergen-Enkheim with the Fechenheimer Wald recreation area.
Integral Structure Connects City & Recreation Area
Reinforced concrete cantilevers extend the two abutments, which are founded on drilled piles, towards the carriageways. The central steel cross-section of the structure consists of two lateral hollow sections. Between them is the orthotropic carriageway slab, which is flexurally rigidly connected to the cantilevers.

Architecture
Werner Sobek, Stuttgart/Germany
Planning time
2020 – 2021
Services by Werner Sobek
- Object planning, structural engineering (WP 2 –3 acc. to HOAI)
- Structural engineering (WP 2 –3 acc. to HOAI)
- BIM technical coordination
(Demand Planning; Visualisation; Coordination of Disciplines; Design Reviews and QA/QC; Analysis, simulation and verification; Derivation of drawings and documents; Quantity take off and cost analysis/estimation)
Bridge area
308 m²
Client
Die Autobahn GmbH des Bundes, Gelnhausen/Germany
Photography
Werner Sobek, Stuttgart/Germany