![Schiffshebewerk Niederfinow](https://www.wernersobek.com/wp-content/uploads/resized/2022/10/Schiffshebewerk_Niederfinow_01_bearbeitet-e1665048687969-1248x546-c-center.jpg)
Ship’s Hoist in Niederfinow Officially Opened
After 14 years of construction, the ship lift in Niederfinow (near Berlin) was officially inaugurated on 4 October 2022. Werner Sobek was responsible for the structural engineering of the 520 million Euro project.
The new vertical lift will overcome a height of about 37 m – and that in about 30 minutes of lock passage. In future, the new ship lift will also enable larger cargo ships, such as the “Great Rhine Ship” with a length of 110 metres and a width of 11.4 metres, to navigate the Oder-Havel Waterway.